Skip to content
Get a free estimate

Where we build

RENOVA Signature Projects builds across 12 communities in Palm Beach County, from our shop in Delray Beach. Every city has its own permitting process, architectural review and building stock — the pages below cover what that means for your project.

Twelve cities, twelve building departments

Palm Beach County is not one jurisdiction. Every city on this list runs its own building department, sets its own submittal requirements and works through review at its own pace. Delray Beach, Boca Raton and Palm Beach Gardens operate full departments with online intake and predictable turnaround.

The small barrier-island towns work differently. Gulf Stream, Ocean Ridge, Highland Beach and Manalapan have very few staff, so an incomplete submittal does not go to the back of the queue — it stops. Knowing which reviewer sees a drawing set, and what they expect on it, is most of what keeps a schedule intact.

Coastal, island and inland are three different builds

On the ocean side, work seaward of the Coastal Construction Control Line picks up a state review on top of town permitting, and sea turtle nesting season restricts exterior lighting and beach-side work from March through October. Flood elevation and wind-borne debris requirements settle foundation and glazing decisions before a drawing is final.

Inland, the constraint is usually the architectural review board rather than the city. Gated communities such as PGA National, BallenIsles, Old Palm and Frenchman’s Creek meet on fixed calendars and enforce approved material palettes, and those dates govern a schedule more tightly than the permit counter does.

Why the service area stops where it does

This list is bounded by supervision, not by marketing. Every city here is close enough to our Delray Beach shop that a project manager is on site daily rather than weekly, and our trades are not spending half a day in traffic to get there.

That proximity is also what makes the local knowledge on these pages worth anything. Permit timelines, board calendars and inspection habits are learned by working in a place repeatedly — they are not researched once and reused.

Common questions

Often, yes. These are the communities we work in regularly, close enough to our Delray Beach shop that supervision stays daily rather than occasional. We take projects elsewhere in Palm Beach County case by case, and the deciding factor is whether we can staff the site properly, not the mileage on the map.

Each municipality runs its own building department with its own submittal requirements and review times. Delray Beach, Boca Raton and Palm Beach Gardens operate full departments with online intake; the smaller barrier-island towns have very few staff, so a complete, correct first submittal matters far more than in a larger jurisdiction.

Yes, and in the gated communities it is frequently the longer pole. Boards such as those at PGA National, BallenIsles, Frenchman’s Creek and Old Palm meet on fixed calendars and enforce approved material palettes. We build their submittal dates into the schedule from the start rather than discovering them mid-project.

Considerably. Work seaward of the Coastal Construction Control Line adds a state review on top of town permitting, sea turtle nesting season restricts exterior lighting and beach-side work between March and October, and flood elevation and wind-borne debris requirements shape foundations and glazing before any drawing is final.

Yes. RENOVA Signature Projects is a licensed and insured Florida general contractor. Several towns also require contractors to register locally before pulling a permit, which we handle as part of the permitting work rather than passing back to the owner.

Not as a line item. Distance shows up in logistics rather than price — sites with no staging room, guardhouse check-in, or narrow island streets need deliveries sequenced more tightly. We plan for that in the schedule, and it is one reason we keep the service area tight.